Transition
Each precondition is listed with its current answer, so a blocked handover explains itself.
Handover plans
2
Completed
1
Blocked or in progress
1
Post-exit checks due
1
Handover plans
| Plan | Site | Status | Inventory | Competency | Ownership | Funding months | Follow-up | Action |
|---|---|---|---|---|---|---|---|---|
| HO07 | S07 | Draft | Accepted | Demonstrated | Signed | 1 / 6 required | — | |
| HO08 | S08 | Completed | Accepted | Demonstrated | Signed | 8 / 6 required | 01 Sept 2026 |
Post-exit checks
A failing check raises a corrective action with an owner and a date.
| Check | Site | Handover | Due | Status | Result | Action raised | Record |
|---|---|---|---|---|---|---|---|
| PE08 | S08 | HO08 | 01 Sept 2026 | Overdue | — | — |